Removal of packaging
Integrated Washing Machine – Removal of packaging
We will take away the packaging that comes with your appliance.
SERVICE CHECKLIST:
Please ensure the following before ordering our connection services
- There is enough space for the new appliance (check appliance dimensions)
- The correct plumbing and waste connection within 1.5m of relevant space (we can supply a longer feed hose for an additional charge)
- The stop valves are working correctly (the water supply can be shut off)
- The correct supply outlet electrical connection within 1.5m
- Please clear the service area, including adjacent cupboards that may need to be accessed to get to electrical and plumbing connections
- Ensure that the relevant kitchen cupboard door is in a fit state to be fixed to the appliance.